To tackle flooding along Trincity Central Road, the Ministry’s Drainage Division is constructing a massive U-section drain—spanning approximately 6 meters wide and 420 meters long. This transformative project is designed to significantly reduce flooding in the area, ensuring better drainage and quick water run-off during heavy rainfall.
.jpg.aspx?width=899&height=591)