Navigational Warning 078/24


Navigational

NAVIGATIONAL WARNING 078/24
TRINIDAD SOUTHEAST COAST
CHART BA 1045

Masters and operators of all marine craft are hereby advised that vessels Cobeia, Voe Vanguard and Pioneer P will be conducting Export Pipeline Installation activities for a period thirty (30) days from 20th April 2024 to the 19th May 2024 within the Teak, Samaan and Poui Block along the following positions:

Pt. 1 Lat. 10- 08.66 N Pt.2 Lat. 10- 09.21 N
Long 060- 59.25 W Long 060- 55.08 W

Pt. 3 Lat. 10- 09.59 N Pt. 4 Lat. 10- 09.94 N
Long 060- 51.51 W Long 060- 48.36 W

Pt. 5 Lat. 10- 10.29 N Pt. 6 Lat. 10- 10.57 N
Long 060- 44.85 W Long 060- 41.53 W

A wide berth of five hundred meters is required and extreme caution is advised.

DATUM WGS 84

16th April 2024

Signed Ronald Alfred
Director of Maritime Services
Maritime Services Division
Ministry of Works and Transport

Download Navigational Notice