Navigational
NAVIGATIONAL WARNING 084/22
TRINIDAD SOUTH EAST COAST CHART BA 501
Masters and operators of all marine craft are hereby advised that the Seven Borealis would be conducting Pipeline Installation Operations for a period of Ninety [90] days from the 21st September 2022 to 19th December 2022 within the Teak Samman Poui, South East Galeota, East Mayaro and South East Coast Consortium Blocks at positions :
Pt.1 Lat. 10- 07.06 N Long 060- 59.43 W
Pt 2 Lat. 10- 05.65 N Long 060- 59.30 W
Pt 3 Lat 10- 04.30 N Long 060- 58.15 W
Pt 4 Lat. 09- 55.31 N Long 060- 32.11W
Pt 5 Lat. 09- 55.30 N Long 060- 31.03W
Pt 6 Lat 09- 56.05 N Long 060- 26.79 W
Pt 7 Lat. 09- 56.13 N Long 060- 25.58 W
Pt 8 Lat. 10- 05.19 N Long 060- 18.18 W
Pt 9 Lat 10- 05.68 N Long 060- 17.94W
Pt 10 Lat. 10- 06.06 N Long 060-19.14 W
DATUM WGS 84
A wide berth of 500 meters is required and extreme caution are advised.
20th September 2022
Signed Ronald Alfred
Director of Maritime Services
Maritime Services Division
Ministry of Works and Transport
Download Navigational Notice