Repairs to the B1/2 Bridge at Golden Grove Road Commences
14 Oct 2020
On Tuesday 13th October 2020, the carriageway that spans the length of the B1/2 Bridge, Golden Grove Road collapsed making the roadway inaccessible to localized traffic. The Ministry of Works and Transport is mindful of the criticality of this connector bridge as it serves as a main access point between the Churchill Roosevelt Highway and the Eastern Main Road. As such, works are ongoing to restore unencumbered travel to drivers in the shortest possible time.