Public
The Ministry of Works and Transport wishes to advise the public that there will be a temporary traffic disruption for all vehicular traffic at Cipero Road, between 8.2-8.4km mark, Borde Narve Village, San Fernando. This is necessary in order to facilitate Slope Stabilization Works, which is expected to commence on 29th March, 2022 and end on 30th April, 2022.
The hours of work are 9:00a.m. - 3:30p.m.
Traffic during this period would be limited to a single lane within the work zone. Alternative routes are available for local and non-local traffic.
In light of the above, motorists are advised to comply with the following:
• Proceed with caution and observe all directional signs and barriers.
• Comply with instructions from Police Officers & flag persons on-site to facilitate a safe and orderly flow of traffic.
• Be aware of heavy equipment entering and exiting the site.
• Motorists should drive at a reduced speed on approaching the work zone.
Alternate Routes Available:
1. For commuters / non-local traffic, one can journey from Cipero Road at the intersection of the M2 Ring Road (turn left), then (turn right) to journey onto the Manahambre Road, (turn right) onto Naparima Mayaro Road, then (turn right) leading onto the St. Croix Road, which connects back onto the Cipero Road.
(See Map 1).
OR
For commuters / non-local traffic, one can journey from Cipero Road at the intersection of the M2 Ring Road (turn left),then (turn right) to journey onto the M1 Tasker Road, (turn right) onto Naparima Mayaro Road, then (turn right) leading onto the St. Croix Road, which connects back onto the Cipero Road.
(See Map 2).
For further information and updates, visit www.mowt.gov.tt and official social media pages.
Download Public Notice